首页> 外文会议>Rapid excavation and tunneling conference >Construction of the inter-island tunnel boston harbor project
【24h】

Construction of the inter-island tunnel boston harbor project

机译:岛际隧道波士顿港项目的建设

获取原文

摘要

The Inter-Island Tunnel is a 7.7 kilometer (25,160 foot) long by 3.5 meter (11.5 feet) diameter concrete lined tunnel through the Cambridge formation below Boston Harbor. Constructed as part of the Boston Harbor Project, this tunnel will bring untreated waste water from the MWRA's Sough System headworks facility at Nut Island in Quincy, MA to the new Deer Island treatment plant. A myriad of problems delayed the construction of the tunnel. These problems included slat water inflows of over 22,000 liters (5, 812 gallons) per minute, a major fire in the access shaft, weak rock and soil collapsing on the tunnel boring machine, and hand mining operations.
机译:岛际隧道长7.7公里(25,160英尺),直径3.5米(11.5英尺),衬砌穿过波士顿港下面的剑桥地层的混凝土衬砌隧道。该隧道是波士顿港项目的一部分,将把未经处理的废水从马萨诸塞州昆西的纳特岛的MWRA的萨克系统主工厂引至新的鹿岛处理厂。各种各样的问题推迟了隧道的建设。这些问题包括每分钟超过22,000升(5,812加仑)的板条水流入量,通道井中的大火,隧道掘进机上软弱的岩石和土壤崩塌以及手工开采作业。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号