首页> 外文会议>Rapid excavation and tunneling conference >LYON-TURIN HIGH SPEED RAILWAY LINK-ITALIAN PART BASE TUNNEL MIXED SHIELD TBM PROPOSAL
【24h】

LYON-TURIN HIGH SPEED RAILWAY LINK-ITALIAN PART BASE TUNNEL MIXED SHIELD TBM PROPOSAL

机译:利昂 - 都灵高速铁路联系 - 意大利部分隧道混合盾牌TBM建议

获取原文

摘要

This paper provides an overview on the studies carried out during the preparation of Lyon-Turin high speed railway link detailed design on the proposed mixed shield TBM excavation for approx. 9 out of the 12 km section of the Italian part base tunnel. Different geological formations and geomechanical conditions are expected to be encountered, including faults, high overburden, hard and highly fractured rocks as well as loose permeable soils with high water pressures. An overview on calculations of critical sections and TBM specifications is provided.
机译:本文概述了在制备层内高速铁路链接在提出的混合屏蔽TBM挖掘时进行的研究期间进行的研究概述了。 9意大利底座隧道的12公里段中有9个。预计会遇到不同的地质地层和地质力学条件,包括故障,高负担率,硬质和高度骨折的岩石以及具有高水压的透气污水。提供了关于关键部分和TBM规范计算的概述。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号