首页> 外文会议>Rapid excavation and tunneling conference >URBAN EPB TUNNELING IN DIFFICULT GEOLOGY BELOW DOWNTOWN MEXICO CITY
【24h】

URBAN EPB TUNNELING IN DIFFICULT GEOLOGY BELOW DOWNTOWN MEXICO CITY

机译:Urban EPB隧道在墨西哥城市市中心的困难地质中

获取原文

摘要

The unique aspects of soft ground TBM tunneling in urban environments can be challenging, particularly for low cover tunnels. At 10.2 m in diameter, Mexico’s largest EPB is excavating the capital’s first new metro line in ten years. The 7.7 km tunnel route travels under cover ranging from 7.5 m to 20 m, and within meters of sensitive structures including building foundations and a highway overpass. In addition to the project location, the ground conditions are some of the most difficult in the world. Modern Mexico City was founded in 1524, on what was once an island in the middle of Lake Texcoco. Ground conditions along the route of the city’s new line consist of soft clay interspersed with sand, gravels, significant ground water, and large boulders up to 800 mm in diameter. This paper will address the unique challenges of urban tunneling in a downtown area, as well as the design of the EPB TBM needed for excavation in challenging geology. The current status of the project and any problems encountered to date will also be presented.
机译:城市环境中软磨机TBM隧道的独特方面可能具有挑战性,特别是对于低覆盖隧道。直径10.2米,墨西哥最大的EPB在十年内挖掘了首都第一个新的地铁线。 7.7公里的隧道路线在覆盖下行驶,范围从7.5米到20米,在米的敏感结构范围内,包括建筑基础和高速公路立交桥。除了项目位置,地面条件是世界上最困难的。现代墨西哥城成立于1524年,曾在德州湖中间曾经是一个岛屿。沿着城市的新线路的地面条件包括软粘土,穿插着砂,砾石,大型地面水和直径高达800毫米的大巨石。本文将解决城市隧道在市中心区的独特挑战,以及在挑战地质中挖掘的EPB TBM设计。还将提出项目的当前状态以及迄今遇到的任何问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号