CONSTRUCTION GROUTING OF THE BAUMGARTNER TUNNEL

机译:Baumgartner隧道的建设灌浆

获取原文

摘要

The Baumgartner tunnel collects sanitary sewage and conveys it to a treatment plant near the mouth of the Meramec River. The nearly 6.2 km (4 mile) long, 3.8 m (12.5 foot) diameter tunnel is 49 to 55 meters (160 to 180 feet) below the Meramec River. During construction, a previously unidentified water-bearing zone containing hydrogen sulfide gas was encountered in the bedrock. The zone, first encountered above the tunnel, eventually intersected the tunnel and was also encountered during the excavation of the screen and lift station shafts. It was necessary to grout the seams within this zone ahead of the tunnel boring machine (TBM) to mitigate water inflow and the risk of encountering dangerous levels of gas.
机译:Baumgartner隧道收集卫生污水,并将其传达给Meramec河口附近的治疗厂。近6.2公里(4英里)长,3.8米(12.5英尺)直径的隧道是Meramec河下方49至55米(160至180英尺)。在施工过程中,在基岩中遇到了含有硫化氢气体的先前未识别的含水区。该区域首先在隧道上方遇到,最终相交,并且在屏幕和提升站轴的挖掘过程中也遇到了隧道。有必要在隧道镗床(TBM)之前填充该区域内的接缝,以减轻水流入和遇到危险天然气水平的风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号