首页> 外文会议>IFAC conference on control of industrial systems control for the future of the youth"" >Compensating for plant nonlinearities: gain-scheduling or feedback linearisation?
【24h】

Compensating for plant nonlinearities: gain-scheduling or feedback linearisation?

机译:补偿工厂非线性:增益调度或反馈线性化?

获取原文

摘要

Controllers designed by the gain-scheduling and feedback linearisation methodologies are analysed and compared for a class of SISO plants which encompasses a wide variety of practical applications. These controllers are, on the face of it, quite different both in structure and with regard to their range of applicability. Nevertheless, the feedback linearisation and gain-scheduling solutions are, with regard to their linearising action, shown to be equivalent. The equivalence does not, however, extend to the robustness and ease of implementation. In particular, full plant state information is required for feedback linearisation but not gain-scheduling.
机译:通过增益调度和反馈线性化方法论设计的控制器,针对一类SISO工厂进行了分析和比较,该工厂涵盖了许多实际应用。从表面上看,这些控制器在结构和适用范围方面都大不相同。然而,就其线性化作用而言,反馈线性化和增益调度解决方案被证明是等效的。但是,其等效性并未扩展到健壮性和易于实现的程度。特别是,对于反馈线性化,需要完整的工厂状态信息,而无需进行增益调度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号