Construction of concrete face slabs for the rockfill dam of Dongjing Hydropower Station

机译:东京水电站堆石坝混凝土面板的施工。

获取原文

摘要

1, There should be three or four quarries before the construction of the temporary flood-proofing cross section, and enough storage of cushion and other materials was necessary. Rapid rockfill to build a 60m high temporary dam in the first drought period which could fulfil the river closure and rockfill of low water period to flood-proofing task is feasible.2, For the treatment of dam foundation, it was reliable to take measures of filling gullies with low strength concrete and changing steep slops into gentle ones with grouted rubbles. This method did not cause the big nonuniform settlement of dam.3, The artificial placement of mortar on the upstream cushion surface could protect dam from the 38.16m deep, water during the flood period, and this method was very simple. That can be further discussed and developed in the future.4, For the treatment of reverse osmosis, drainage holes should be preserved in the plinth in advance during the concrete placement so that drilling could be avoided.
机译:1,临时防洪断面施工前应有3或4个采石场,并且必须足够存放垫子和其他材料。在第一次干旱时期快速堆石修建高60m的临时水坝是可行的,它可以满足河道的封闭和低水期堆石的防洪工作。 2,对于坝基的处理,采用低强度混凝土填充沟壑,将陡坡改成平缓的,注满碎石的措施是可靠的。这种方法并没有引起大坝的不均匀沉降。 3,在上游垫层表面人工浇筑砂浆可以在洪水期间保护大坝免受38.16m深的水浸,这种方法非常简单。将来可以进一步讨论和发展。 4,为进行反渗透处理,在混凝土浇筑时应事先在底座上预留排水孔,以免钻孔。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号