首页> 外文会议>Rapid transit conference of the American Public Transit Association >Organizing and executing the operations interface for major projects
【24h】

Organizing and executing the operations interface for major projects

机译:组织和执行重大项目的操作界面

获取原文

摘要

Major transit capital projects are not built in a vacuum. They thread through existing areas and either provide a new system or extend/improve an existing one. Any such project must not only be funded and well engineered, but it must also provide a system and/or facilities that are operable, compatible with the transit environment and the existing system and, over time, provide competitive passenger service.
机译:大型过境资本项目并非一尘不染。他们遍历现有区域并提供新系统或扩展/改善现有系统。任何此类项目不仅必须获得资金和精心设计,而且还必须提供可操作,与运输环境和现有系统兼容的系统和/或设施,并随着时间的推移提供有竞争力的乘客服务。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号