DESIGN AND CONSTRUCTION OF A CUT-OFF WALL IN WARM PERMAFROST

机译:多年冻土防渗墙的设计与施工

获取原文

摘要

In 2002 Teck Alaska Inc. (TAK) commissioned Golder Associates Inc. (Golder) to design a Back Dam to minimize the potential for seepage at the southern end of the tailings impoundment at their Red Dog Mine zinc operation in Alaska. The Back Dam was to be designed for an elevation of 960 ft with a planned closure elevation of 986 ft and was to include provisions to reduce long-term seepage through the native materials and weathered bedrock.
机译:2002年,Teck Alaska Inc.(TAK)委托Golder Associates Inc.(Golder)设计一个后水坝,以最大程度地减少阿拉斯加Red Dog Mine锌矿场尾矿库房南端的渗漏可能性。后水坝的设计高度为960英尺,计划的封闭高度为986英尺,其中将包括有关减少天然材料和风化基岩长期渗漏的措施。