首页> 外国专利> EARTH RETAINING WALL COMPOSED OF HORIZONTAL SHEATHING WITH SOLDIER BEAM, AND CUT-OFF STRUCTURE, CONSTRUCTION METHOD AND CUT-OFF METHOD FOR THE EARTH RETAINING WALL

EARTH RETAINING WALL COMPOSED OF HORIZONTAL SHEATHING WITH SOLDIER BEAM, AND CUT-OFF STRUCTURE, CONSTRUCTION METHOD AND CUT-OFF METHOD FOR THE EARTH RETAINING WALL

机译:带有横梁的水平护套的挡土墙以及挡土墙的防渗结构,施工方法和防渗方法

摘要

PROBLEM TO BE SOLVED: To provide an earth retaining wall composed of horizontal sheathing with a soldier beam, which prevents the protrusion of groundwater and the outflow of sediment in the construction of the earth retaining wall, and which can be easily removed after the construction; and to provide a construction method for the earth retaining wall.;SOLUTION: The horizontal sheathing 1 with the soldier beams comprises the soldier beams 2 which are to be driven at predetermined intervals into ground 10, horizontal sheathing 3 which is installed between the soldier beams 2, and cut-off sections 4 which are formed only in positions to block off the flow of the groundwater in aquifers 6 and 8 of the ground 10, respectively.;COPYRIGHT: (C)2009,JPO&INPIT
机译:解决的问题:提供一种由水平护套和士兵束组成的挡土墙,该挡土墙可防止地下水渗出和泥沙在施工过程中的流出,并且在施工后可轻松清除;解决方案:具有士兵横梁的水平护套1包括以预定间隔驱动到地面10中的士兵横梁2,水平护套3安装在士兵横梁之间2和截留部分4,截留部分分别形成在分别阻挡地下水在地面10的含水层6和8中的位置。版权所有:(C)2009,JPO&INPIT

著录项

  • 公开/公告号JP2009068203A

    专利类型

  • 公开/公告日2009-04-02

    原文格式PDF

  • 申请/专利权人 OHBAYASHI CORP;

    申请/专利号JP20070235706

  • 发明设计人 UENO TAKAYUKI;MORIO YOSHIHIKO;

    申请日2007-09-11

  • 分类号E02D5/02;E02D5/18;

  • 国家 JP

  • 入库时间 2022-08-21 19:43:33

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号