Local Rescheduling - A Novel Approach for Efficient Response to Schedule Disruptions

机译:本地重新安排-一种有效应对计划中断的新方法

获取原文

摘要

Whenever an unforeseen disturbance occurs during the execution of scheduled operations, rescheduling might be necessary: Beside temporal shifts and the allocation of alternative resources, also potential switches from one process variant to another one have typically to be considered. In realistic scenarios of operational disruption management (DM) the high number of potential options makes the provision of online decision support complex. It is thus necessary to significantly reduce the size of the regarded (search) problems which can for instance be achieved by applying methods of partial rescheduling. However, existing approaches such as affected operations rescheduling (AOR) or matchup scheduling (MUP) focus on production-specific problems and can not be applied to more generic problem classes. To overcome this limitation, we introduce a novel approach to partial rescheduling in this paper: local rescheduling (LRS) is based on the incremental extension of a time window which is regarded for potential schedule modifications. We discuss how this time window can be initialized, extended and used for rescheduling. Moreover, we illustrate the superior performance of LRS in comparison with full rescheduling and MUP
机译:每当在计划的操作执行过程中发生不可预见的干扰时,都可能需要重新计划:除了时间上的变化和备用资源的分配以外,通常还必须考虑从一种过程变体到另一种过程变体的潜在切换。在实际的操作中断管理(DM)场景中,大量的潜在选择使在线决策支持的提供变得复杂。因此,有必要显着减小所考虑的(搜索)问题的大小,这例如可以通过应用部分重新调度的方法来实现。但是,诸如受影响的操作重新计划(AOR)或匹配计划(MUP)之类的现有方法集中在特定于生产的问题上,不能应用于更通用的问题类别。为了克服此限制,我们在本文中介绍了一种用于部分重新计划的新颖方法:本地重新计划(LRS)基于时间窗口的增量扩展,该时间窗被认为可能用于计划的修改。我们讨论如何初始化,扩展此时间窗口并将其用于重新计划。此外,我们展示了与完全重新计划和MUP相比,LRS的优越性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号