首页> 外文会议>ISRM Regional Symposium Eurock 2001 Jun 4-7, 2001, Espoo/Finland >Grouting field investigations in rock tunnels at South Link Stockholm
【24h】

Grouting field investigations in rock tunnels at South Link Stockholm

机译:斯德哥尔摩南环线岩石隧道的灌浆现场调查

获取原文
获取原文并翻译 | 示例

摘要

During the construction of the rock tunnels at the South Link, Stockholm, grout investigations were carried out. The aim was to develop alternative methods/concepts for sealing of tunnels compared to the methods/concepts described in the contract. The investigation started with a laboratory study, which outlined the most appropriate grouts for field trials. The field trials consisted of seven grout fans. The front of each fan was divided for equal pumping test values, and grouted with different concepts. The sealing result and the spreading of the grout were studied in 10 holes in the tunnel front and in 10 holes perpendicular to the tunnel. The holes were test pumped and studied with a bore hole camera. From the investigation it was concluded that regardless the maximum grain size of cement (9.5, 16 or 30 μm) fine fractures (< 100 μm) were still unsealed after grouting. In open fractures or rock masses (>1 Lugeon) the micro cement was more effective than the more coarse cement type. Higher stop pressure did not give a better sealing result and some parameters achieved at laboratory especially for micro cements were not possible to reproduce with ordinary field mixers.
机译:在斯德哥尔摩南环的岩石隧道施工期间,进行了灌浆调查。与合同中描述的方法/概念相比,目的是开发替代隧道密封的方法/概念。该调查从实验室研究开始,概述了最适合实地试验的灌浆。现场试验由七名灌浆爱好者组成。将每个风扇的前部划分为相等的泵送测试值,并用不同的概念灌浆。在隧道前部的10个孔和垂直于隧道的10个孔中研究了密封效果和灌浆的扩散。将孔测试泵送并用钻孔摄像机进行研究。从研究得出的结论是,无论水泥的最大晶粒尺寸(9.5、16或30μm),灌浆后仍未密封细裂缝(<100μm)。在开放性裂缝或岩体(> 1 Lugeon)中,微水泥比较粗水泥类型更有效。较高的停止压力不能提供更好的密封效果,并且在实验室中达到的某些参数,特别是对于微型水泥而言,不可能用普通的现场混合器来再现。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号