首页> 外文会议>IPMA(International Project Management Association) World Congress on Project Management; 20061015-17; Shanghai(CN) >STUDY ON HUMAN RESOURCE ALLOCTION IN MULTI-PROJECT BASED ON THE PRIORITY AND THE COST OF PROJECTS
【24h】

STUDY ON HUMAN RESOURCE ALLOCTION IN MULTI-PROJECT BASED ON THE PRIORITY AND THE COST OF PROJECTS

机译:基于项目优先级和成本的多项目人力资源配置研究

获取原文
获取原文并翻译 | 示例

摘要

This paper put forward the affecting factors of project's priority, which is introduced into a multi-objective optimization model for human resource allocation in multi-project environment. The objectives of the model were the minimum cost loss due to the delay of the time limit of the projects and the minimum delay of the project with the highest priority. Then a Genetic Algorithm to solve the model was introduced. Finally, a numerical example was used to testify the feasibility of the model and the algorithm.
机译:提出了项目优先级的影响因素,并将其引入多项目环境下人力资源分配的多目标优化模型。该模型的目标是由于项目期限的延迟而导致的最小成本损失,以及具有最高优先级的项目的最小延迟。然后介绍了一种遗传算法来求解模型。最后,通过算例验证了该模型和算法的可行性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号