Resource-constraint Multi-project Scheduling with Priorities and Uncertain Activity Durations

机译:具有优先级和不确定活动持续时间的资源受限的多项目计划

获取原文
获取原文并翻译 | 示例
           

摘要

Resource-constraint multi-project scheduling is one of the most important topic in the field of project management. Most current works solve this problem based on an idea that multiple projects can be simply emerged into a super-project in a deterministic environment, regardless of the project priority and robustness of schedules. This paper discusses the RCMPSP with priority and formulates a discrete bi-objective decision model. A modified NSGA-Ⅱ based algorithm is presented to solve the model. Furthermore, we design systematic experiments to investigate the interrelationship between robustness and its related project parameters, including order strength, resource constrainedness and uncertainty level. The results demonstrate the effectiveness of the solution algorithm and show that the three parameters indeed have evident impacts on the robustness and makespan of projects.
机译:资源受限的多项目调度是项目管理领域中最重要的主题之一。当前的大多数工作都是基于这样的想法来解决这个问题的:无论确定项目的优先级和进度表的健壮性,都可以在确定性的环境中将多个项目简单地变成一个超级项目。本文讨论了具有优先权的RCMPSP,并提出了一个离散的双目标决策模型。提出了一种基于NSGA-Ⅱ的改进算法来求解模型。此外,我们设计了系统的实验来研究鲁棒性及其相关项目参数之间的相互关系,包括订单强度,资源约束和不确定性水平。结果证明了该算法的有效性,并表明这三个参数确实对项目的健壮性和有效期具有明显的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号