ASSESSMENT OF THE SAFETY PERFORMANCE OF THE PAKS NUCLEAR POWER PLANT UNITS USING ADVANCED ANALYSIS AND COMPREHENSIVE PERIODIC SAFETY REVIEWS

机译:使用高级分析和全面的定期安全性评估来评估PAKS核电厂的安全性能

获取原文
获取原文并翻译 | 示例

摘要

Because of international interest in the safety of Soviet designed reactors, comprehensive safety reviews have been carried out in recent years for the Paks nuclear power plant (NPP) units. In addition to routine inspection and review work by the regulatory body, a reassessment of the safety of the Paks NPP was launched in 1991 by the Hungarian Atomic Energy Commission (HAEC). Furthermore, according to the legal regulations of Hungary, a periodic safety review (PSR) of the first two units of the Paks NPP is under way and will be finished by the end of 1996. The advanced, general and new evaluation of safety (AGNES) project was successfully completed by mid-1994, producing results on system analysis, analysis of design basis accidents and severe accidents, and level 1 probabilistic safety assessment. The results of the reassessment have verified the expectations concerning the large safety margins of the WWER-440/V-213 systems; however, several weaknesses have also been highlighted. The main risk contributors have been identified and included in the already existing safety enhancement programme of the Paks NPP. The main conclusion of the AGNES project is that the safety level of the Paks NPP has reached that of other NPPs constructed at the same time and that it is high enough for the plant to be operated. However, safety upgrading measures have to be implemented in the near future for further enhancement of safety. The
机译:由于国际上对苏联设计的反应堆安全性的关注,近年来对帕克斯核电站(NPP)装置进行了全面的安全审查。除了管理机构的例行检查和审查工作外,匈牙利原子能委员会(HAEC)于1991年对Paks NPP的安全性进行了重新评估。此外,根据匈牙利的法律规定,对帕克斯核电厂前两个机组的定期安全审查(PSR)正在进行中,并将于1996年底完成。安全性的先进,一般和新评估(AGNES) )项目在1994年年中成功完成,产生了系统分析,设计基准事故和严重事故分析以及1级概率安全评估的结果。重新评估的结果证实了对WWER-440 / V-213系统的较大安全裕度的期望;但是,一些缺点也已被强调。确定了主要的风险因素,并将其包括在Paks NPP现有的安全增强计划中。 AGNES项目的主要结论是,Paks核电厂的安全水平已经达到了同时建造的其他NPP的安全水平,并且对于运行工厂而言已经足够高。但是,必须在不久的将来实施安全升级措施,以进一步增强安全性。的

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号