ENVIRONMENTAL IMPACT ASSESSMENT OF INTERNATIONAL BORDER CROSSING PROJECTS

机译:国际跨界项目的环境影响评估

获取原文
获取原文并翻译 | 示例

摘要

Canada and the United States are the world's largest trading partners, withrnalmost half of this trade crossing between the Province of Ontario and thernState of Michigan. The Sarnia/Port Huron area contains two of the majorrninternational transportation trade links; Canadian National's St. Clair RiverrnTunnel (rail) and the Blue Water Bridge (road).rnIn the early 1990's, the owners and operators of each of these facilitiesrnrealized that major capacity improvements would be required to servernincreasing demands and that these improvements should be in place asrnsoon as possible in order to keep the corridor competitive with alternativernlocations, particularly the Detroit-Windsor corridor 85km to the south.rnCapacity expansion was scheduled to proceed at each location on a fastrntrack program. Key to this accelerated schedule was the timely completionrnof environmental assessments, required as a prerequisite to obtaining allrngovernment approvals. This required that a comprehensive environmentalrndatabase be established with the early identification of potential projectrnissues.rnInvolvement of over 300 stakeholders and government agencies in the USrnand Canada was solicited for each of the capacity expansion projects.rnTransportation and environmental legislation in both countries wasrnreviewed to develop detailed work programs. A coordinated team ofrnlawyers, engineers, air quality specialists, noise and vibration experts,rnarchaeologists, land use planners, and other environmental specialistsrnensured that project work encompassed all areas of the environment, wasrnissue focussed and carried out in an efficient manner.rnThe purpose of this paper is to describe each study including key tasks,rnfactors considered, project alternatives, potential environmental impactsrnand mitigation measures. Also discussed are issues raised by intervenorsrnduring the permitting and approvals phase. Key study aspectsrncontributing to the success of each environmental assessment arernpresented as well as recommendations for carrying out similar fast trackrnprojects.
机译:加拿大和美国是世界上最大的贸易伙伴,安大略省和密歇根州之间的贸易跨境几乎占了一半。萨尼亚/休伦港地区包含两个主要的国际运输贸易联系;加拿大国民的圣克莱尔河隧道(铁路)和蓝水桥(公路)。在1990年代初期,这些设施中的每一个的所有者和经营者都意识到,为了满足不断增长的需求,将需要进行重大的容量改进,并且这些改进措施应该到位为了使走廊在其他位置保持竞争力,尤其是南面85公里的底特律-温莎走廊,尽可能保持最快的速度。rnrn计划在每个位置通过快速通道计划进行容量扩展。加快进度的关键是及时完成环境评估,这是获得政府批准的前提。这就要求建立一个全面的环境数据库,并尽早发现潜在的项目问题。rn美国和加拿大的300多个利益相关者和政府机构参与了每个产能扩展项目。rn审查了两国的运输和环境法规以制定详细的工作程式。由律师,工程师,空气质量专家,噪声和振动专家,考古学家,土地使用规划人员以及其他环境专家组成的协调团队确保项目工作涵盖了环境的所有领域,并着重关注并有效地开展了组织工作。本文将描述每项研究,包括关键任务,考虑的因素,项目替代方案,潜在的环境影响和缓解措施。还讨论了在许可和批准阶段介入者提出的问题。提出了有助于每次环境评估成功的关键研究方面,并提出了开展类似快速通道项目的建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号