首页> 外文会议>International Conference on Modeling and Analysis of Semiconductor Manufacturing (MASM 2000), May 10-12, 2000, Tempe, Arizona >MULTI-OBJECTIVE SCHEDULING IN SEMICONDUCTOR TEST MANUFACTURING USING SIMULATION BASED ON-LINE NEAR-REAL-TIME SYSTEM
【24h】

MULTI-OBJECTIVE SCHEDULING IN SEMICONDUCTOR TEST MANUFACTURING USING SIMULATION BASED ON-LINE NEAR-REAL-TIME SYSTEM

机译:基于在线近时系统的仿真在半导体测试制造中的多目标调度

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

We have conceptualized, designed, and developed a discrete event simulation based "on-line near-real-time" dynamic schedule optimization system. Simulation is initiated from the real time status of the facilities, orders, work-in-process, and manufacturing system, at a desired frequency of several times a day. The simulation run with integrated optimization algorithms, defined rules and policies then gives a repeatable performance and desired schedule that should be followed in the test operations in near term. The system has been implemented and is in use at Infineon Technologies AP PTE LTD. The impact of the system is expected to be the achievement high delivery accuracy, improved machine utilization, narrow cycle time distribution, reduction in the time that planners and manufacturing personnel spend on scheduling, and more predictable and highly repeatable manufacturing performance. In addition it enables managers and senior planners to carry out "what if analysis to plan for future.
机译:我们已经概念化,设计和开发了基于“在线近实时”动态计划优化系统的离散事件模拟。根据设施,订单,在制品和制造系统的实时状态以每天几次的期望频率启动仿真。然后使用集成的优化算法,定义的规则和策略进行仿真,从而提供可重复的性能和所需的时间表,短期内应在测试操作中遵循该时间表。该系统已经实施并在Infineon Technologies AP PTE LTD中使用。该系统的影响有望实现高交付精度,提高机器利用率,缩短周期时间分配,减少计划者和制造人员在计划上花费的时间以及更可预测和高度可重复的制造性能。此外,它使管理人员和高级计划人员可以进行“假设分析以计划未来”。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号