首页> 外文会议>International Conference on Industrial Engineering and Engineering Management vol.1; 20050423-25; Shenyang(CN) >TO ESTIMATE THE NUMBER OF SETUPS AND THE SETUP TIME FOR IDENTICAL PARALLEL-MACHINE PROBLEM WITH DYNAMIC JOB ARRIVING
【24h】

TO ESTIMATE THE NUMBER OF SETUPS AND THE SETUP TIME FOR IDENTICAL PARALLEL-MACHINE PROBLEM WITH DYNAMIC JOB ARRIVING

机译:估计带有动态作业的并行机问题的设置次数和设置时间

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

In this paper consider a number of identical machines in parallel where jobs with different product types arrive dynamically for processing, and provides the probabilistic models to estimate the number of setups and the setup time with sequence-independent and sequence-dependent. A simulation model is built to evaluate the accuracy of the probabilistic model for various levels of rescheduling periods and job arriving rates. The applications of the probabilistic models are also provided.
机译:在本文中,考虑并行运行的许多相同机器,具有不同产品类型的作业将动态到达以进行处理,并提供了概率模型,以估计与序列无关和与序列有关的设置数量和设置时间。建立了一个仿真模型来评估概率模型在各种级别的重新安排时间和工作到达率方面的准确性。还提供了概率模型的应用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号