TO ESTIMATE THE NUMBER OF SETUPS AND THE SETUP TIME FOR IDENTICAL PARALLEL-MACHINE PROBLEM WITH DYNAMIC JOB ARRIVING

机译:估计具有动态作业到达的相同并行机器问题的设置数量和设置时间

获取原文

摘要

In this paper consider a number of identical machines in parallel where jobs with different product types arrive dynamically for processing, and provides the probabilistic models to estimate the number of setups and the setup time with sequence-independent and sequence-dependent. A simulation model is built to evaluate the accuracy of the probabilistic model for various levels of rescheduling periods and job arriving rates. The applications of the probabilistic models are also provided.
机译:在本文中,将许多相同的机器并行地,其中具有不同产品类型的作业动态到达处理,并提供概率模型来估计序列无关和序列依赖的设置和设置时间的数量。 建立了模拟模型,以评估各种级别重新安排周期和工作到达率的概率模型的准确性。 还提供了概率模型的应用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号