An Evaluation of Construction Time Performance of Public Sector Civil Engineering Projects in Malaysia

机译:马来西亚公共部门土木工程项目施工时间绩效评估

获取原文
获取原文并翻译 | 示例

摘要

Construction time performance often serves as a benchmark for assessing the performance of a project and the efficiency of the project organization. The construction time demands the focus of attention of all the key participants in the construction process and it is during this period that the greatest part of resources are irreversibly committed. Construction industries in many countries have been increasingly recognizing the need for more efficient and timely completion of projects. Often, a number of unexpected problems arise during the construction phase leading to time overruns. Several factors related to project characteristics might also contributed towards this problem. The main objectives of the study are to assess the current level of construction time performance and to identify factors affecting them. Secondary data were collected from public sector civil engineering projects involving irrigation and drainage, roads and sewerage projects in Peninsular Malaysia. Multiple regression analysis revealed that construction time performance was influenced by certain excusable factors allowed for under the contract as well as some factors related to project characteristics. Identifying factors responsible for causing delay is one of the prerequisites for a good construction time management. The findings could also be used to improve construction time for future public projects.
机译:施工时间绩效通常用作评估项目绩效和项目组织效率的基准。施工时间需要所有关键参与者的注意力集中在施工过程中,正是在此期间,不可逆转地投入了大部分资源。许多国家的建筑行业越来越认识到需要更有效,更及时地完成项目。通常,在施工阶段会出现许多意想不到的问题,导致时间超支。与项目特征相关的几个因素也可能导致此问题。该研究的主要目标是评估当前的施工时间绩效水平并确定影响他们的因素。次要数据来自马来西亚半岛的公共部门土木工程项目,涉及灌溉和排水,道路和污水处理项目。多元回归分析表明,施工时间的表现受合同允许的某些可辩护因素以及一些与项目特征有关的因素的影响。识别造成延迟的因素是良好的施工时间管理的先决条件之一。研究结果还可以用于缩短未来公共项目的建设时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号