An Evaluation of Construction Time Performance of Public Sector Civil Engineering Projects in Malaysia

机译:马来西亚公共部门土木工程项目施工时间绩效评价

获取原文

摘要

Construction time performance often serves as a benchmark for assessing the performance of a project and the efficiency of the project organization. The construction time demands the focus of attention of all the key participants in the construction process and it is during this period that the greatest part of resources are irreversibly committed. Construction industries in many countries have been increasingly recognizing the need for more efficient and timely completion of projects. Often, a number of unexpected problems arise during the construction phase leading to time overruns. Several factors related to project characteristics might also contributed towards this problem. The main objectives of the study are to assess the current level of construction time performance and to identify factors affecting them. Secondary data were collected from public sector civil engineering projects involving irrigation and drainage, roads and sewerage projects in Peninsular Malaysia. Multiple regression analysis revealed that construction time performance was influenced by certain excusable factors allowed for under the contract as well as some factors related to project characteristics. Identifying factors responsible for causing delay is one of the prerequisites for a good construction time management. The findings could also be used to improve construction time for future public projects.
机译:施工时间性能通常是评估项目性能和项目组织效率的基准。施工时间要求施工过程中所有关键参与者注意的重点,并且在此期间,资源最大的资源是不可逆转的致力的。许多国家的建筑行业越来越认识到需要更高效,更及时地完成项目。通常,在施工阶段期间出现了许多意想不到的问题,导致时间过度升级。与项目特征有关的几个因素也可能导致这个问题。该研究的主要目标是评估当前的施工时间绩效水平,并识别影响它们的因素。从涉及半岛马来西亚的灌溉和排水,道路和污水处理项目的公共部门土木工程项目中收集二级数据。多元回归分析显示,施工时间绩效受合同下允许某些可原因的影响以及与项目特征有关的因素影响。识别负责造成延迟的因素是良好施工时间管理的先决条件之一。这些结果也可用于改善未来公共项目的施工时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号