Stayed Viaduct in Bucaramanga, Colombia

机译:住在哥伦比亚布卡拉曼加的高架桥

获取原文

摘要

The Carrera Novena viaduct in Bucaramanga is situated over a wooded area of great environmentalimportance which must be respected. The proposed viaduct with a principal span of 292.4m andtwo compensation spans 129.2m long. The maximum height over the ravine is 75m and the piers ofthe viaduct have heights of 52m and 72m; for this reason singles piers have been used, over whichthe towers have been built which stay the deck in its axis. It is 30m wide because 6 lanes of trafficand 2m wide pedestrian walkways were planned. The structure of the deck is formed of a singlecellbox girder with a trapezoidal section and a depth of 2.8m. This girder is extended laterally byslabs. Its width creates significant bending moments which are resisted by interior transversetriangulations and exterior struts every 3.4m. It is situated in a zone of high seismic activity and forthat reason a structure has been adopted which is encastred in the piers and free in the abutments. Itwas constructed using successive compensated cantilevers, and concreted in situ.
机译:布卡拉曼加的Carrera Novena高架桥位于环境非常重要的林木区,必须予以尊重。拟议的高架桥主跨为292.4m,两个补偿跨为129.2m长。山沟上的最大高度为75m,高架桥墩的高度分别为52m和72m。由于这个原因,已经使用了单墩,在其上建造了塔,这些塔将甲板保持在其轴线上。由于计划规划6条行车线和2m宽的人行道,所以它的宽度为30m。甲板的结构由具有梯形截面且深度为2.8m的单格箱梁形成。该大梁横向延伸通过平板。它的宽度产生很大的弯曲力矩,每3.4m会受到内部横向三角剖分和外部支柱的抵抗。它位于地震活动频繁的区域,因此采用了一种结构,该结构被浇筑在码头中,而在桥墩中则是自由的。它是使用连续的补偿悬臂建造的,并现场浇筑混凝土。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号