【24h】

Scheduling utility workers at mixed-model assembly lines

机译:在混合模型装配线上安排公用事业工人

获取原文

摘要

One of the main performance parameters for sequencing workpieces at mixed-model assembly lines is utility work, i.e. the amount of work a worker can't process within the limits of his station. A common assumption in literature is that utility work is compensated by utility workers, but a dedicated scheduling of utility workers is usually neglected. This paper attempts to fill this gap by presenting a new anticipative scheduling approach, which is compared to a traditional real-life approach. It is shown that schedules of the anticipative approach require a lower number of utility workers to cope with the utility work at an assembly line.
机译:在混合模型装配线上对工件进行排序的主要性能参数之一是公用事业工作,即,工人无法在其工位范围内进行的工作量。文献中一个常见的假设是,公用事业工作由公用事业工作者补偿,但通常忽略了专门安排公用事业工作者的时间表。本文试图通过提出一种新的预期调度方法来填补这一空白,并将其与传统的现实生活方法进行比较。结果表明,预期方法的时间表需要更少的公用事业工人来应对装配线中的公用事业工作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号