首页> 外文会议>IEEE International Conference on Environment and Electrical Engineering;IEEE Industrial and Commercial Power Systems Europe >An MILP Model for Short-Term Peak Shaving Operation of Cascaded Hydropower Plants Considering Unit Commitment
【24h】

An MILP Model for Short-Term Peak Shaving Operation of Cascaded Hydropower Plants Considering Unit Commitment

机译:考虑机组组合的梯级水电站短期调峰运行的MILP模型

获取原文

摘要

To relieve the growing peaking regulation pressure on power gird and satisfy complex demand for scheduling of grid-connected units, this paper formulates a short-term peak shaving model for cascaded hydropower plants, in which operation status of units are taken into account. In this model, hydropower units are taken as the basic dispatching unit and minimizing the maximum residual load of power grid is adopted as the objective. With the linearization of the nonlinear objective, constraints related with water head, restricted operating zone constraint and unit performance curves, the developed model conforms to a standard MILP formulation. The compact MILP model is applied to the short-term operation of four cascaded hydropower plants located in Wujiang River. The results demonstrate that the proposed model has an excellent performance in peak shaving and high efficiency in computation.
机译:为了缓解不断增长的电网调峰压力并满足复杂的并网机组调度需求,本文提出了一种考虑级联机组运行状态的短期梯级调峰模型。该模型以水力发电机组为基本调度单元,以最小化电网最大剩余负荷为目标。通过非线性目标的线性化,与水头有关的约束,受限制的工作区约束和单元性能曲线,开发的模型符合标准的MILP公式。紧凑型MILP模型适用于位于乌江的四个梯级水电站的短期运行。结果表明,所提出的模型具有优异的削峰性能和较高的计算效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号