首页> 外文会议>IEEE Conference on Control Technology and Applications >Scheduling in Concentrating Solar Power Plants Based on Model Predictive Control and Binary-Regularization Methods
【24h】

Scheduling in Concentrating Solar Power Plants Based on Model Predictive Control and Binary-Regularization Methods

机译:基于模型预测控制和二元正则化方法的聚光太阳能电厂调度

获取原文

摘要

formulation is the inclusion of a turbine protection method based on a binary-regularization term that penalizes for changes of the turbine output and binary constraints that limit the number of daily turbine startups. Binary variables are used to avoid penalization of the turbine start-up and shutdown. These extensions of the classical MPC approach aim to preserve the turbine lifetime. An interesting question is if this protection mechanism affect the economic results of the CSP plant. An included economic study shows that the proposed scheduling method provides a good trade-off between the economic profits obtained from energy sales and the protection of the generation block. The study is based on a realistic simulation of a 50 MW parabolic trough collector-based CSP with TES under the assumption of participation in the Spanish day-ahead energy market scenario.
机译:该公式包括基于二进制调节项的涡轮机保护方法,该术语对涡轮机输出的变化和限制日常涡轮机启动次数的二进制约束进行了惩罚。使用二进制变量可避免对涡轮机启动和停机造成不利影响。经典MPC方法的这些扩展旨在保留涡轮机的使用寿命。一个有趣的问题是这种保护机制是否会影响CSP工厂的经济效益。一项包括在内的经济研究表明,所提出的调度方法在从能源销售中获得的经济利润与发电区块的保护之间提供了良好的权衡。这项研究基于对50兆瓦抛物线槽收集器式CSP和TES的真实模拟,并假设其参与了西班牙日前的能源市场情景。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号