首页> 外文会议>ICCSE 2012;International Conference on computer science & education >Simulation and optimization of material flow system for “the mode of one open ladle” in BF-BOF region
【24h】

Simulation and optimization of material flow system for “the mode of one open ladle” in BF-BOF region

机译:高炉转炉区域“一开式钢包模式”物料流系统的仿真与优化

获取原文

摘要

For the purpose of making the waiting time less and production capacity more in “the mode of one open ladle” which is in the blast furnace (BF) — basic oxygen furnace (BOF) region, a new method based on queuing theory and material flow simulation(using Witness software) is carried out in this work. The indicators comparisons between single-queue and multi-queues have been made; it could be found that the indicators of single-queue queuing system were better than those of the multi-queues system. What''s more, on the basis of single-queue, according to the simulation experiments in BF-BOF region of a steel plant, the queuing simulation systems which were used to describe the relationships among the numbers of HMCL (hot metal charging ladle) s in cycle, production capacity and average waiting time were studied. The results imply that the type of queuing and HMCLs in cycle have effects on the waiting time and production capacity. The optimization model has been developed to obtain the optimal numbers of HMCLs in cycle with less waiting time and higher production capacity.
机译:为了减少高炉(BF)-碱性氧气炉(BOF)区域中的“一个开放式钢包模式”的等待时间并提高生产能力,这是一种基于排队论和物料流的新方法在这项工作中进行了仿真(使用见证软件)。已经对单队列和多队列之间的指标进行了比较;可以发现,单队列排队系统的指标优于多队列排队系统的指标。此外,根据单排队法,根据某钢厂高炉-转炉区域的模拟实验,采用排队模拟系统描述了HMCL(铁水装料钢包)数量之间的关系。 )的周期,产能和平均等待时间。结果表明,排队的类型和循环中的HMCL对等待时间和生产能力都有影响。已经开发了优化模型,以期以更少的等待时间和更高的生产能力获得最佳数量的HMCL。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号