【24h】

Nuremberg Metro Line U3 Northwest Extension Stations and Tracks in Inner-City Areas

机译:纽伦堡地铁线U3市区内西北延伸站和轨道

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

When building a metro in a medieval city like Nuremberg the challenges are not limited to thernactual tunnelling. The limited amount of space available and various construction managementrnissues have to be considered in planning just as much and just as carefully. This reportrndescribes the problems that ensued in the design and construction of the 1,1 km long trackrnbetween two stations, which methods were used to solve them and how this was achieved.rnDetailed descriptions of the construction methods are given as well as the reasons behind thernspecial constructive solutions that were used. The floating slab system used in the Nurembergrnmetro system is also explained and how it increases comfort and reduces noise pollution.
机译:在像纽伦堡这样的中世纪城市中建造地铁时,挑战不仅限于实际隧道。在规划时必须尽可能多地和谨慎地考虑有限的可用空间和各种施工管理问题。本报告描述了两个车站之间1,1 km长的轨道的设计和施工过程中所遇到的问题,解决这些问题的方法以及如何实现的.rn详细说明了这些施工方法以及产生这种特殊原因的原因所使用的建设性解决方案。还介绍了纽伦堡地铁系统中使用的浮动平板系统,以及如何提高舒适度并减少噪音污染。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号