Penang Bridge was completed in 1985 as the main linkway between mainland Peninsular Malaysiarnand the island of Penang. The approach spans are currently being widened from 2-lane dualrncarriageway to 3-lane dual carriageway including an additional motorcycle lane on eachrncarriageway due to huge increase in traffic volumes since the bridge was originally completed.rnThere is a need to monitor the structural health condition during construction activities for anyrnpossible short-term effects and also post-construction for long-term bridge performance. Arnmonitoring system for settlement, tilt and vibration is implemented at Penang Bridge to monitorrnstructural health. Data from sensors positioned along the full-length of the bridge are picked-up andrntransmitted to the data-logger system via wireless modem and this allows real-time monitoring to berncarried out remotely at the control centre. The system has proven to be able to pick-up any majorrnchanges in the structural condition of the bridge and provide ample warning, especially during therncurrent construction stage. Once the widening works has been completed, the system will remain asrna permanent means of monitoring the long-term structural health of the bridge.
机译:槟城大桥于1985年建成,是马来半岛和槟城之间的主要通道。由于桥梁最初建成以来交通量的巨大增加,目前的进近跨度已从2车道双行车道扩大到3车道双行车道,并在每条行车道上增加了一条摩托车行车道。进行任何可能的短期影响的施工活动,以及为了长期桥梁性能而进行的后期施工。槟城大桥采用了用于沉降,倾斜和振动的监测系统来监测结构健康。来自沿桥全长位置的传感器的数据被采集并通过无线调制解调器传输到数据记录器系统,这使得可以在控制中心远程进行实时监控。该系统已被证明能够吸收桥梁结构状况的任何重大变化并提供充分的警告,尤其是在当前施工阶段。一旦拓宽工作完成,该系统将成为监测桥梁长期结构健康的永久手段。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号