【24h】

Crocodiles Protection: Impact for Chambal River Bridge Design

机译:鳄鱼保护:对香巴拉河大桥设计的影响

获取原文
获取原文并翻译 | 示例

摘要

This bridge, the first axial suspension cable-stayed bridge in India, had to meet some challengingrnrequirements for the protection of crocodiles in the Chambal river.rnIn order not disturbing the crocodiles, modern and specific techniques had to be used for the design.rnBed rock profile and deposit thickness below water were mainly determined by using satelliternimagery. Geophysics using a resistivity method was implemented in order to assess the weatheredrnzones on a large scale. A 3D model of the cliff at pier P5 was elaborated.The design of the noisernbarriers shape required wind tunnel tests, in order to limit vortex-shedding vibrations.
机译:这座桥是印度第一座轴向悬索斜拉桥,必须满足在香波河保护鳄鱼的一些严峻要求。剖面和水下的沉积物厚度主要通过卫星图像确定。为了大范围评估风化带,实施了使用电阻率法的地球物理学。绘制了P5码头悬崖的3D模型,设计了噪声屏障形状需要进行风洞测试,以限制涡流脱落的振动。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号