首页> 美国政府科技报告 >Flood Control Minnesota River, Minnesota, Mankato-North Mankato-Le Hillier. Design Memorandum Number 8. Part I. Location Study and Draft Supplement II to the Final Environmental Impact Statement for Bridge Relocations. Main Street, Trunk Highways 60 Bridge over the Minnesota River between Mankato and North Mankato.
【24h】

Flood Control Minnesota River, Minnesota, Mankato-North Mankato-Le Hillier. Design Memorandum Number 8. Part I. Location Study and Draft Supplement II to the Final Environmental Impact Statement for Bridge Relocations. Main Street, Trunk Highways 60 Bridge over the Minnesota River between Mankato and North Mankato.

机译:防洪明尼苏达河,明尼苏达州,mankato-North mankato-Le Hillier。设计备忘录编号8.第一部分桥梁重新安置最终环境影响报告的地点研究和补充草案II。主街,主干高速公路60大桥在曼凯托和北曼凯托之间的明尼苏达河上。

获取原文

摘要

The St. Paul District is constructing flood control works on the Minnesota and Blue Earth Rivers to protect developed portions of Mankato, North Mankato and Le Hillier lying in the floodplain from frequent flood damage. The Main Street bridge over the Minnesota must be raised or replaced to an elevation approximately 30 feet above the existing bridge to clear the railroad on the Mankato side. Two plans were selected for detailed study. The tentatively selected plan 1CA would begin in North Mankato on Belgrade Ave. at the same location as the existing bridge and connect to Mulberry Street one block north of Main Street. Adverse neighborhood impacts would be most severe in Mankato. (Author)

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号