【24h】

The Requirement and Early RD Programme

机译:需求与早期研发计划

获取原文
获取原文并翻译 | 示例

摘要

This paper is based on a paper presented by Peter Jones to The British Rocket Oral History Conference in 2003. Prime Minister Harold Macmillan obtained the agreement of President John Kennedy in the meeting in Nassau in December 1962 to the UK purchase of Polaris. The resulting Polaris Sales Agreement of 6 April 1963 led to the UK building four nuclear submarines, each to be fitted with the US Polaris weapon system and 16 US launch tubes and US Polaris A3 missiles. Each missile carried three re-entry bodies (ReBs). AWRE was given the task of developing, producing and service acceptance of a UK warhead to fit in a US re-entry vehicle. In 1964 and 1965, two UK underground nuclear tests in Nevada provided the necessary nuclear performance data.
机译:本文基于彼得·琼斯(Peter Jones)在2003年英国火箭口述历史会议上发表的论文。总理哈罗德·麦克米伦(Harold Macmillan)于1962年12月在拿骚举行的会议上获得了约翰·肯尼迪总统的同意,同意在英国购买北极星。根据1963年4月6日签订的北极星销售协议,英国建造了4艘核潜艇,每艘都装有美国北极星武器系统,16枚美国发射管和美国北极星A3导弹。每枚导弹都携带三个再入物体(ReB)。 AWRE的任务是开发,生产和接受用于美国重返飞行器的英国弹头。 1964年和1965年,英国在内华达州进行的两次地下核试验提供了必要的核性能数据。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号