首页> 外文会议>Global windpower 2004 conference and exhibition >PERFORMANCE AND MAINTENANCE EXPERIENCESWITH A WIND TURBINE DURING 20 YEARS OF OPERATION
【24h】

PERFORMANCE AND MAINTENANCE EXPERIENCESWITH A WIND TURBINE DURING 20 YEARS OF OPERATION

机译:在运行20年的风力涡轮机上的性能和维护经验

获取原文
获取原文并翻译 | 示例

摘要

A wind electric generator with a 13.4-m (44-ft) rotor diameter was installed in the SouthernrnGreat Plains at the USDA Conservation and Production Research Laboratory, Bushland,rnTX, in May 1982 and was operated to assist in providing electricity to a 23 kW (30 hp)rnirrigation pump motor. The original turbine was a 240 V, single-phase generator with arnrated capacity of 25 kW. This prototype unit was changed to a three-phase, 40 kWrngenerator production unit in 1984 and later that year, a three-phase, 480 V generator ratedrnat 60 kW was installed. All three units used the same size rotor and design. The windrnturbine has generated power for over 93,811 hours during the 20 years and producedrnalmost 1,425,641 kWh of electricity. The wind turbine operated for 53.6% of the hoursrnsince installation and recorded a capacity factor of 20.4%. Although several componentrnfailures occurred during the testing period, the wind turbine had an availability of 90%.
机译:1982年5月,转子直径为13.4 m(44 ft)的风力发电机安装在南大平原的USDA布什兰德市USDA保护和生产研究实验室,并运行以协助提供23 kW的电力(30 hp)灌溉泵马达。最初的涡轮机为240 V单相发电机,额定容量为25 kW。 1984年,该原型机改为三相40 kW发电机生产单元,同年晚些时候,安装了额定功率60 kW的三相480 V发电机。这三个单元均使用相同尺寸的转子和设计。在过去的20年中,风轮机发电超过93,811小时,发电量几乎达到1,425,641 kWh。自安装以来,风力涡轮机的运行时间为53.6%,记录的容量系数为20.4%。尽管在测试期间发生了几项组件故障,但风力涡轮机的可用性为90%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号