首页> 外文会议>First International Nuclear amp; Renewable Energy Conference (INREC 10) >Experimental orthogonal functions for the qualification of BWR stability events. Application to Peach Bottom NPP
【24h】

Experimental orthogonal functions for the qualification of BWR stability events. Application to Peach Bottom NPP

机译:验证BWR稳定性事件的实验正交函数。桃底NPP的应用

获取原文
获取原文并翻译 | 示例

摘要

In this work, BWR stability analysis was performed on an operating point (PT_UPV) of Peach Bottom NPP which is inside the exclusion region. The simulation was made with the coupled code RELAP5-MOD3.3/PARCSv2.7. This point is achieved departing from test point 3 by a control rod movement as it is usually performed in Nuclear Power Plants.
机译:在这项工作中,对排除区域内的桃底NPP的工作点(PT_UPV)进行了BWR稳定性分析。使用耦合代码RELAP5-MOD3.3 / PARCSv2.7进行了仿真。该点是通过通常在核电站中执行的控制棒运动来偏离测试点3的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号