首页> 外文会议>Fifth Conference on Mechanical Behavior of Salt, Mecasalt V, Aug 9-11, 1999, Bucharest, Romania >Comparative study of the convergence of a tunnel excavated in rock salt: Mathematical modelling, in-situ measurement, and numerical solution
【24h】

Comparative study of the convergence of a tunnel excavated in rock salt: Mathematical modelling, in-situ measurement, and numerical solution

机译:岩盐开挖隧道收敛性的比较研究:数学建模,现场测量和数值解

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

One of the most important investigation methods of the geomechanical phenomena around the underground mining excavation is the mathematical modelling method. It allows the correlation of theoretical models with both the laboratory data and the field measurements. This paper presents the constitutive equations of Cristescu type [l]-[2], determined from a large number of distinct laboratory tests. The aim is to describe the time behaviour of rock salt around underground mining excavations. Generally, in the mathematical models used today one is making several simplifying assumptions, which could yield to some discrepancies when the results are compared with the measurements "in situ". Thus, mathematical models, which would describe more accurately the mechanical properties exhibited by rock salt, are needed.
机译:数学建模方法是地下采矿开挖周围地质力学现象最重要的调查方法之一。它允许理论模型与实验室数据和现场测量值相关联。本文介绍了由大量不同的实验室测试确定的Cristescu类型[1]-[2]的本构方程。目的是描述地下采矿开挖周围岩盐的时间行为。通常,在当今使用的数学模型中,人们会做出几个简化的假设,当将结果与“原位”测量结果进行比较时,可能会产生一些差异。因此,需要可以更准确地描述岩盐所表现出的机械性能的数学模型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号