Theme 3: The Business Side of InstrumentationStaged Embankment Construction Using In-Situ Instrumentation ReturnsBenefits To Contractor and Cost Savings to the Owner

机译:主题三:仪器仪表的业务方面,利用现场仪器仪表的收益分阶段进行堤防建设,对承包商有利,对业主节省成本

获取原文
获取原文并翻译 | 示例

摘要

The Piedmont Triad International Airport (PTIA) is undergoing anrnexpansion including a new runway (Runway 5L-23R) and taxiway (Taxiway E) as arnresult of the construction of a regional hub for Federal Express. Part of thernconstruction of the associated Taxiway E includes the construction of thernembankment over a wetlands area in an alluvial floodplain. The presence of softrnground in the wetlands area required careful consideration of the effects ofrnconstruction, due to permitting requirements. An instrumentation program wasrnimplemented to determine the fill placement rates or appropriate waiting periodsrnduring fill placement, and to prevent slope failures from occurring. This paperrnhighlights key features of the instrumentation system. It describes therninstrumentation system that was installed, the results obtained to date, and practicalrnissues that were addressed during construction. The grading plans for the projectrnindicate the construction of an 18 meters (60-feet) high earth embankment over thernexisting soft ground. The subsurface exploration indicated the soft ground profile tornconsist of an upper zone of alluvial soil underlain by a residual soil profile. A hybridrnground modification technique was used to stabilize the soft ground, allowingrnconstruction of the Taxiway E embankment without more intensive efforts. The usernof ground stabilization to provide a working platform in conjunction with toe bermsrnto maintain slope stability and wick drains to accelerate drainage, strength gain, andrnsettlement offered benefits to all members of the project team. The instrumentationrnprogram resulted in both material and time savings, by allowing for the modificationrnof the design based on field conditions, and reducing or eliminating the waitingrnperiods between fill placement phases.
机译:皮埃蒙特·黑社会国际机场(PTIA)正在进行扩建,包括新建一条跑道(5L-23R跑道)和滑行道(Taxiway E),以作为联邦快递区域枢纽建设的结果。相关的滑行道E的部分建设包括冲积洪泛区湿地地区的堤防建设。由于许可要求,在湿地中存在软土地需要仔细考虑建筑的影响。实施了一个仪器程序来确定填充位置或填充期间的适当等待时间,并防止发生边坡破坏。本文重点介绍了仪表系统的关键功能。它描述了已安装的仪器系统,迄今为止获得的结果以及在施工过程中解决的实际问题。该项目的分级计划表明在已存在的软土地基上建造了一个18米(60英尺)高的土堤。地下勘探表明,软土地层被残留的土壤剖面撕裂,由下层冲积土的上部区域组成。混合地面改性技术用于稳定软土地基,无需花费更多的精力即可进行滑行E路堤的施工。地面稳定的用户提供了一个与脚趾护坡相结合的工作平台,以保持边坡的稳定性,灯芯排水加快了排水,强度的增加和沉降,为项目团队的所有成员带来了好处。通过允许根据现场条件对设计进行修改,并减少或消除填充放置阶段之间的等待时间,仪器程序可以节省材料和时间。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号