Ensuring Efficient Incentive and Disincentive Values for Highway Construction Projects: A Systematic Approach Balancing Road User, Agency and Contractor Acceleration Costs and Savings

机译:确保高速公路建设项目的有效激励和抑制价值:系统方法平衡道路用户,机构和承包商加速成本和储蓄

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

United States State Highway Agencies (SHAs) use Incentive/Disincentives (I/D) to minimize negative impacts of construction on the traveling public through construction acceleration. Current I/D practices have the following short-comings: not standardized, over- or under-compensate contractors, lack of auditability result in disincentives that leave SHAs vulnerable to contractor claims and litigation and are based on agency costs/savings rather than contractor acceleration. Presented within this paper is an eleven-step I/D valuation process. The processes incorporate a US-nationwide RUC and agency cost calculation program, CA4PRS and a time-cost tradeoff I/D process. The incentive calculation used is the summation of the contractor acceleration and a reasonable contractor bonus (based on shared agency savings) with an optional reduction of contractor’s own saving from schedule compression (acceleration). The process has a capability to be used both within the US and internationally with minor modifications, relies on historical costs, is simple and is auditable and repeatable. As such, it is a practical tool for optimizing I/D amounts and bridges the gap in existing literature both by its industry applicability, integrating the solution into existing SHA practices and its foundation of contractor acceleration costs.
机译:美国国家公路机构(SAC)使用奖励/抑制措施(I / D)来通过建设加速来最大限度地减少建设对旅游公众的负面影响。当前的I / D实践具有以下短暂的措施:未标准化,或偿还承包商,缺乏可审计性的抑制性,使SCAS易受承包商索赔和诉讼的侵害,并且基于代理成本/储蓄而不是承包商加速。本文介绍,是一个十一步I / D估值过程。该过程纳入了美国 - 全国范围的RUC和代理商成本计算计划,CA4PRS和时间成本权衡I / D流程。使用的激励计算是承包商加速度的总和,以及合理的承包商奖金(根据共享代理储蓄),并可选择减少承包商自身储蓄(加速)。该过程有能力在美国内部和国际上进行使用,并缩小历史成本依赖,简单,是可审计和可重复的。因此,它是一种实用的工具,用于优化I / D的数量,并通过其行业适用性弥合现有文献中的差距,将该解决方案集成到现有的沙法实践及其承包商加速成本的基础。

著录项

  • 作者

    Eul-Bum Lee; Douglas Alleman;

  • 作者单位
  • 年度 2018
  • 总页数
  • 原文格式 PDF
  • 正文语种 eng