Theme 3: The Business Side of Instrumentation - Staged Embankment Construction Using In-Situ Instrumentation Returns Benefits To Contractor and Cost Savings to the Owner.

机译:主题3:使用原位仪器的仪表 - 仪器堤防建设的业务方返回承包商的福利,并节省业主。

获取原文

摘要

The Piedmont Triad International Airport (PTIA) is undergoing an expansion including a new runway (Runway 5L-23R) and taxiway (Taxiway E) as a result of the construction of a regional hub for Federal Express. Part of the construction of the associated Taxiway E includes the construction of the embankment over a wetlands area in an alluvial floodplain. The presence of soft ground in the wetlands area required careful consideration of the effects of construction, due to permitting requirements. An instrumentation program was implemented to determine the fill placement rates or appropriate waiting periods during fill placement, and to prevent slope failures from occurring. This paper highlights key features of the instrumentation system. It describes the instrumentation system that was installed, the results obtained to date, and practical issues that were addressed during construction. The grading plans for the project indicate the construction of an 18 meters (60-feet) high earth embankment over the existing soft ground. The subsurface exploration indicated the soft ground profile to consist of an upper zone of alluvial soil underlain by a residual soil profile. A hybrid ground modification technique was used to stabilize the soft ground, allowing construction of the Taxiway E embankment without more intensive efforts. The use of ground stabilization to provide a working platform in conjunction with toe berms to maintain slope stability and wick drains to accelerate drainage, strength gain, and settlement offered benefits to all members of the project team. The instrumentation program resulted in both material and time savings, by allowing for the modification of the design based on field conditions, and reducing or eliminating the waiting periods between fill placement phases.
机译:Piedmont Triad国际机场(Ptia)正在进行一个扩张,包括新的跑道(跑道5L-23R)和滑行道(Taxiway E),因为联邦快递的区域中心的建造。相关的滑行道E的一部分建设包括在冲积洪泛区的湿地区域的堤防建设。由于允许的要求,湿地区在湿地区域的软接地的存在需要仔细考虑建筑的影响。实施了仪表计划,以确定填充放置期间填充放置率或适当的等待时间,并防止发生斜率故障。本文突出了仪表系统的关键特征。它描述了安装的仪器系统,迄今为止获得的结果以及在建设期间解决的实际问题。该项目的分级计划表明,在现有的软土地上建造了18米(60英尺)的高地堤防。地下勘探表明软接地轮廓由残余土壤剖面构成冲积土的上部区域。混合地层改性技术用于稳定软研磨,允许在没有更强化的努力的情况下构建滑行道E堤。地面稳定性的使用提供了与Toe Berms一起提供的工作平台,以保持边坡稳定性和芯漏,以加速排水,强度增益和结算为项目团队的所有成员提供了利益。通过基于现场条件允许修改设计,仪器仪表,仪器仪表导致材料和时间耗尽两者,并减少或消除填充放置阶段之间的等待时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号