After a short description of the SPOT 5 satellite and its equipment platform, the most severe specification constraints will be detailed and consequently, the development plan will be presented. During the initial development phase T4, the tool concept and all the manufacturing steps were validated on sub-components, allowing the final design and stress phase T5a to proceed, leading on to the fabrication phase T5b. A short description of the design and the finite element model followed by the assembly of the two sandwich panels and the struts shall be presented. In order to qualify the manufacturing and the FE model, ten static mechanical tests have been carried out on the unique flight model. Results and comparison with the FE predictions will be shown. Following the qualification tests, a final dimensional inspection of the SPOT 5 equipment platform was performed, confirming the absence of any significant deformation compared to the initial measurements.
机译:在简短描述SPOT 5卫星及其设备平台之后,将详细介绍最严格的规格约束,并随后提出开发计划。在初始开发阶段T4中,工具概念和所有制造步骤均在子组件上进行了验证,从而使最终设计和应力阶段T5a得以进行,从而进入了制造阶段T5b。将给出设计和有限元模型的简短描述,然后是两个夹心板和支柱的组装。为了使制造和有限元模型合格,已对唯一的飞行模型进行了十次静态机械测试。将显示结果和与有限元预测的比较。在进行资格测试之后,对SPOT 5设备平台进行了最终尺寸检查,确认与初始测量相比没有任何明显的变形。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号