Tunneling in cold regions presents many unique engineering challenges. When that region is the South Pole, these challenges become extreme. In 1996, the U.S. Army Cold Regions Research and Engineering Laboratory first deployed the South Pole Tunneling System. This system was designed and built specifically for machining tunnels in the firn (highly compacted snow) of the Antarctic ice cap. The tunneling machine creates 2- x 3-m tunnels through the material at depths of up to 16 m. A pneumatic chip disposal system transfers the debris to the surface, where a centrifugal fan powers the disposal system. This system has been used to create two tunnels for water and power transport in support of the new South Pole Station currently under construction. This paper will discuss some of the engineering challenges faced by both the designers and operators of the equipment over the course of four deployments.
机译:在寒冷地区的隧道施工提出了许多独特的工程挑战。当该地区是南极时,这些挑战就变得极端。 1996年,美国陆军寒冷地区研究与工程实验室首次部署了南极隧道系统。该系统是专门为在南极冰盖的火成岩(高度压实的雪)中加工隧道而设计和建造的。隧道掘进机在不超过16 m的深度处通过材料创建2- x 3-m的隧道。气动切屑处理系统将碎屑转移到地面,然后由离心风扇为处理系统提供动力。该系统已用于创建两条用于水和电力输送的隧道,以支持目前正在建设中的新南极站。本文将讨论设备的设计人员和操作人员在四次部署过程中面临的一些工程挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号