Design and Operational Issues While Tunneling in Firn at the South Pole Station

机译:南极火车站的隧道设计和运行问题

获取原文

摘要

Locating utilities on the surface at the United States' Amundsen- Scott South Pole Station causes many maintenance problems unique to that environment. The extreme low temperatures, drifting snow, and long, dark winters all restrict easy access to these critical components for most of the year. To avoid these problems, a tunneling system to drive tunnels in the dense, hard firn at the South Pole was designed and built for the National Science Foundation, Office of Polar Programs. From 1996 through 2002, a series of 2 3-m tunnels were driven for the water system for both the current station and the new station at the pole. This report describes the design and operational problems that were addressed while driving these tunnels at Pole.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号