【24h】

zSERIES CAPACITY MANAGEMENT - A TRUE STORY

机译:z系列容量管理-真实的故事

获取原文
获取原文并翻译 | 示例

摘要

In September 2003, just five months after our previous mainframe upgrade, John Lewis added another two processors to their zSeries machine. Within days the peak hour CPU reached 94%; and we hadn't even reached our peak time of year! Fifteen months later, we are running with the same capacity, and have provided an excellent service in the run up to Christmas 2004, despite an increase of over 25% in business transactions. This paper tells how, by a mixture of good luck and good judgement, John Lewis have moved from reactive panic to controlled and effective capacity management.
机译:在我们之前的大型机升级仅五个月后的2003年9月,约翰·刘易斯(John Lewis)在他们的zSeries机器上又增加了两个处理器。几天之内,高峰​​时段的CPU达到了94%;而且我们甚至还没有达到一年中的高峰时间! 15个月后,尽管业务交易量增长了25%以上,我们仍以相同的容量运行,并在2004年圣诞节前提供了出色的服务。本文讲述了好运和明智的判断,约翰·刘易斯如何从被动的恐慌转向控制和有效的能力管理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号