首页> 外文会议>Computer Information Systems and Industrial Management >Productivity Oriented Cooperative Approach to Scheduling IT Project Tasks
【24h】

Productivity Oriented Cooperative Approach to Scheduling IT Project Tasks

机译:以生产力为导向的协作方法来计划IT项目任务

获取原文
获取原文并翻译 | 示例

摘要

Task execution duration depends on the employee who performs the task. Specifically in IT projects, an experienced employee can perform assigned tasks several times faster than a novice worker can. Preparing the schedule, project manager should take into account individuals' productivity determined by analyzing historical data of tasks implementation. Consequently, measured productivity is used in preparing the schedule in an optimal manner (minimizing the time needed to complete project tasks by a team of workers with different skills). As an extension of previous studies the authors formulate a linear programming problem including the possible cooperation of employees with tasks execution. The result of the conducted research is a complete package supporting project managers in determining productivity and scheduling.
机译:任务执行的持续时间取决于执行任务的员工。特别是在IT项目中,经验丰富的员工可以比新手更快地执行分配的任务。在准备进度表时,项目经理应考虑通过分析任务执行的历史数据确定的个人生产力。因此,在以最佳方式准备进度表时会使用测得的生产率(以最少的时间由具有不同技能的一组工人完成项目任务所需的时间)。作为先前研究的扩展,作者提出了一个线性规划问题,其中包括员工可能与任务执行之间的合作。进行研究的结果是一个完整的软件包,可支持项目经理确定生产率和进度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号