...
首页> 外文期刊>Journal of Intelligent Manufacturing >Project-oriented task scheduling for mobile robot team
【24h】

Project-oriented task scheduling for mobile robot team

机译:移动机器人团队面向项目的任务调度

获取原文
获取原文并翻译 | 示例
           

摘要

This paper presents a project-oriented framework for multi-robot task scheduling. An agent-based architecture is designed to schedule tasks where robots are considered as resources. The study focused on the problems when the number of available robots is less than the required number. In this case, the problem becomes a resource-constrained scheduling problem. Initially, tasks are scheduled by using Critical path method (CPM), resource leveling method is used to smooth the deviation between the resource requirements and available resource levels, and tasks are allocated to robots. As robots perform their tasks, a monitoring agent observes them and tasks are rescheduled if the difference between the planned and actual completion time of tasks exceeds a predefined threshold. Effectiveness of the proposed approach is shown by using a nine-task two-robot project simulation.
机译:本文提出了一个面向项目的多机器人任务调度框架。基于代理的体系结构旨在安排将机器人视为资源的任务。研究集中在可用机器人数量少于所需数量时的问题。在这种情况下,该问题将成为资源受限的调度问题。最初,使用关键路径方法(CPM)调度任务,使用资源均衡方法来平滑资源需求和可用资源级别之间的差异,然后将任务分配给机器人。在机器人执行任务时,如果任务的计划完成时间与实际完成时间之间的差异超过预定义的阈值,则监视代理会观察它们并重新计划任务。通过使用九任务两机器人项目仿真,表明了该方法的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号