Unexpected History Lesson and Contractual Deal Making: Lessons Learned from a Large-Diameter Force Main Replacement Project in Downtown Norfolk; Home to Historical Landmarks, High-Rise Buildings, Critical Stakeholders, and Innovative Contractors

机译:意外的历史教训和合同交易:从诺福克市中心的一个大口径部队主要替换项目中学到的教训;历史地标,高层建筑,关键利益相关者和创新承包商的故乡

获取原文

摘要

In what may have been one of the most highly watched, publically visible, large-diameter pipeline projects in Downtown Norfolk's recent history, the Hampton Roads Sanitation District (HRSD) South Trunk Sewer Section G Force Main Replacement Project (Section G) was anything but normal. In a crowded, urban setting, constructing 30-inch force main is difficult and high risk. Section G coupled challenging open-cut work with a 50-inch microtunneling effort under a major thoroughfare and a contractor-proposed 1,000-linear-foot (LF) horizontal directional drill (HDD) alongside the oldest structure in Norfolk, Virginia. The scope of Section G included replacement of three 1940s-era, 30-inch to 36-inch force main segments totaling 6,000 LF in Downtown Norfolk. Understanding the history and evolution of this City was critical for design of the proposed pipeline. Abandoned infrastructure and previous-era land reclamation influenced how the engineer approached subsurface work such as open-cut and trenchless pipe work. In addition to the geological, historical, and urban challenges described, stakeholder involvement was a substantial endeavor during the design process. City of Norfolk agencies, hotel owners, a high-end shopping mall and several other downtown businesses and industries were very active during the design phase and alignment considerations. Construction began in January 2016 and beat the substantial completion date by 4 months, with the overall project ending in August 2017. Several unexpected obstructions and conflicts were avoided using innovative solutions developed from team collaboration. A significant highlight of the construction was the unusual proposal from the contractor to circumvent an especially challenging section of the proposed open-cut alignment by installing pipe using HDD technology. Negotiations resulted in agreement to $1.4 million in HDD costs in exchange for removing $1.4 million of bid-item costs (circumvented by the HDD), resulting in a no-cost modification to the project. Also extremely rare, the proposed HDD path was alongside the oldest structure in Norfolk: a colonial-era, historic church constructed in the 1730s. In the end, the construction went remarkably well, surprising many local residents and stakeholders. Major milestones were met well before deadlines, budgets were maintained, and overall stakeholder perception was decidedly positive. Major successes of the project included early substantial completion and savings of approximately $1 million to the owner. As a result of the project's success, the project team was awarded the distinguished 2016 Engineer's Club of Hampton Roads Engineering Achievement Award. This presentation details how the team strategically worked hand-and-hand with downtown stakeholders. This paper also presents the numerous challenges that many utilities face when installing large pipe in an urban or historic area using various installation methods and strategies to address corresponding design and construction issues. The contractor's proposal to use HDD made a significant contribution to the project's overall success and recognition. The significant time savings and true cost and value analysis are also discussed, comparing open-cut versus HDD in urban, downtown environments.
机译:在诺福克市中心最近的历史中,这可能是最受关注的,公开可见的大口径管道项目之一,汉普顿道路卫生区(HRSD)南干渠污水处理厂G部队主要更换项目(G节)正常。在拥挤的城市环境中,建造30英寸主力总管十分困难且风险很高。 G节结合了具有挑战性的开挖工作,在主要通道上进行的50英寸微隧道工作以及承包商提议的1,000线性英尺(LF)水平定向钻(HDD),以及弗吉尼亚州诺福克最古老的结构。 G节的范围包括在诺福克市中心更换三个1940年代的30英寸至36英寸的力主要段,总计6,000 LF。了解这座城市的历史和演变对于拟建管道的设计至关重要。废弃的基础设施和前期土地开垦影响了工程师处理地下作业的方式,例如明挖和非开挖的管道作业。除了描述的地质,历史和城市挑战外,在设计过程中,利益相关者的参与也是一项巨大的努力。诺福克市政府机构,酒店所有者,高端购物中心以及其他一些市区商业和行业在设计阶段和协调考虑期间非常活跃。该项目于2016年1月开始建设,并在4个月内完成了实质性的完成日期,整个项目于2017年8月结束。通过团队协作开发的创新解决方案避免了一些意外的障碍和冲突。该施工的一个重要亮点是承包商提出的不寻常的建议,即通过使用HDD技术安装管道来规避拟议的明挖路线的特别具有挑战性的部分。谈判达成了硬盘驱动器成本140万美元的协议,以换取140万美元的投标项目成本(由硬盘驱动器规避),从而对该项目进行了无成本的修改。同样极其罕见的是,提议的硬盘驱动器路径与诺福克郡最古老的建筑一起:建于1730年代的殖民时代历史悠久的教堂。最后,施工进展顺利,许多当地居民和利益相关者感到惊讶。在截止日期之前,预算保持不变以及利益相关者的总体看法肯定是积极的之前,就已经实现了重要的里程碑。该项目的重大成功包括早期的实质性完成和为业主节省了约100万美元。由于该项目的成功,项目团队被授予了2016年汉普顿道路工程成就俱乐部杰出工程师奖。此演示文稿详细介绍了团队如何与市中心利益相关者进行战略合作。本文还介绍了许多公用事业公司在使用各种安装方法和策略在城市或历史悠久的地区安装大型管道以解决相应的设计和施工问题时面临的众多挑战。承包商使用HDD的建议为该项目的整体成功和认可做出了重大贡献。还讨论了可节省的大量时间以及真实的成本和价值分析,比较了市区和市区环境中的开孔硬盘与HDD。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号