Pile Foundation Construction for North Port Berths 12 13 at Port Klang

机译:巴生港北港泊位12和13的桩基施工

获取原文
获取原文并翻译 | 示例

摘要

The reconstruction of Berths 12 and 13 at Port Klang, Malaysia into multi-purpose container berths is a major upgrading exercise. The reconstruction of these wharves involves the systematic demolition of the existing wharf structure. This is then followed by installation of new piles and a new reinforced concrete deck slab. The soft sediments accumulated beneath the existing wharves render significant geotechnical risks with regards to the stability of the sediment mound and its effect on the structure and the adjacent berths. Early studies indicated that the sensitivity of the soft sediments would become predominant factors when considering pile installation works within the sediment mound. This paper describes the geotechnical risks attached to the project and the steps taken to mitigate these risks during the construction of the foundations for the new structures.
机译:将马来西亚巴生港的12号和13号泊位重建为多功能集装箱泊位是一项重大的升级工作。这些码头的改造涉及对现有码头结构的系统拆除。然后安装新的桩和新的钢筋混凝土甲板板。在沉积物丘的稳定性及其对结构和相邻泊位的影响方面,在现有码头下方积累的软沉积物具有重大的岩土工程风险。早期研究表明,在考虑泥沙丘中的桩工时,软泥沙的敏感性将成为主要因素。本文介绍了该项目附带的岩土工程风险,以及在建造新结构基础期间为减轻这些风险而采取的步骤。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号