【24h】

High Strain and Low Strain Dynamic Pile Testing at the New Blanchetown Bridge, SA

机译:南新布兰奇敦桥的高应变和低应变动力桩测试

获取原文
获取原文并翻译 | 示例

摘要

This paper describes the use of dynamic pile testing during the construction of a new bridge over the Murray River at Blanchetown, SA. The bridge carries the Sturt Highway, which is the main road link between Adelaide and Sydney. The bridge foundations comprise groups of driven precast prestressed concrete piles and dynamic pile testing was used to establish driving criteria and to confirm pile resistance. At Pier 1, on the Adelaide side of the river, the first piles did not stop at the expected founding level and dynamic testing was used to investigate their behaviour. The testing indicated all piles were broken. A program of high strain and low strain dynamic testing was then used to assess the piles and to investigate alternative methods for successfully driving piles at the required locations. The paper describes the testing methods and an interpretation of the cause of breakages and the remedial methods adopted.
机译:本文介绍了在SA Blanchetown的Murray河上建造新桥时,动态桩测试的使用。这座桥承载着Sturt高速公路,这是阿德莱德和悉尼之间的主要道路连接。桥梁基础包括成组的预制驱动预应力混凝土桩,并通过动态桩试验来建立驱动标准并确定桩的阻力。在河的阿德莱德一侧的1号码头,第一批桩并没有停在预期的建国水平,并通过动态测试来研究其行为。测试表明所有桩都被打碎了。然后使用高应变和低应变动态测试程序评估桩,并研究在所需位置成功打桩的替代方法。本文介绍了测试方法以及破损原因和所采用的补救方法的解释。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号