首页> 外文会议>Annual meeting of the AACE International >Forensic Schedule Analysis - Critical Path Method - Test Evaluation Systems
【24h】

Forensic Schedule Analysis - Critical Path Method - Test Evaluation Systems

机译:法医进度分析-关键路径法-测试和评估系统

获取原文

摘要

In order to evaluate implementation methods described in AACE's Recommended Practices for CPM scheduling and forensic schedule analysis, there is a need for a standard demonstration data set that can act as a common tool for practitioners to demonstrate good practice. This paper makes recommendations for the creation of a Uniform Demonstration Construction Schedule Series (UDCSS), a CPM network model, including a full lifecycle set of updates, which can serve as a standard data set for the demonstration of CPM scheduling concepts, testing of forensic schedule analysis methods, evaluation of scheduling software, and teaching of CPM scheduling, while also serving as an open-source 'sandbox'. The UDCSS will model realistic complexity with a variety of conditions and technical attributes, such as types of relationships, multiple calendars, and activity codes, while also providing flexibility and scalability. Use of the UDCSS would add transparency of practice and provide a familiar and predictable known-state for scientific control.
机译:为了评估CPM计划和法医计划分析的AACE推荐实践中描述的实施方法,需要一种标准的示范数据集,该数据集可以作为从业人员证明良好实践的通用工具。本文为创建统一演示构建进度表系列(UDCSS),CPM网络模型(包括完整的生命周期更新集)提供了建议,该更新集可以用作标准数据集,用于演示CPM进度表概念,法医测试日程安排分析方法,日程安排软件评估以及CPM日程安排的教学,同时还充当开源的“沙盒”。 UDCSS将使用各种条件和技术属性(例如关系类型,多个日历和活动代码)对现实的复杂性进行建模,同时还提供灵活性和可伸缩性。 UDCSS的使用将增加实践的透明度,并为科学控制提供一个熟悉且可预测的已知状态。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号