THE IC MODERNIZATION PROJECT OF THE NPP LEIBSTADT - LESSONS LEARNED FROM THE FIRST MODERNIZATION STEP

机译:NPP LEIBSTADT的I&C现代化项目-从第一步现代化中学到的经验教训

获取原文

摘要

The Swiss Nuclear Electricity Production consists of four sites with a total of 5 Reactors. Together they have a capacity of 3220 MW and cover about 40% of the total Swiss Electricity production. Leibstadt is the first Swiss NPP which performs a comprehensive modernization project of all process related I&C equipment in regard of an intended operation at least until 2045. The project will take more than 15 years since the implementation will be only possible stepwise during the scheduled outages.The first modernization step, which comprised mainly the replacement of the former stand alone process computers including the Safety Parameter Display System SPDS by a common platform, was functionally finished in the outage 2006 with a delay of 2 years over the original target line. But it still left open the upgrade of the platform to the targeted system version which was significantly delayed by the system supplier. This upgrade was finally accomplished during the outage 2008.The platform now conforms to a full blown integrated Plant Information Systems with all relevant applications and functions but above this, it forms already the operating & monitoring level of the future integrated process control system for the operational as well as the safety I&C.With each of the upcoming further modernization steps, parts of the process level will be added to the digital system resp. platform by replacing the existing analog equipment for signal interrogation, component control and automation functions like sequencer or switchover functions.The paper deals on with the operational experience between 2006 and 2008 and the measures which became necessary due to problems and flaws in the system behaviour. Also the operational experience with the upgraded system since the outage 2008 will be compared to the previous experience. The central content of the paper will be the strategy for the upgrade of the platform, the execution of it as well as enhancements of the platform in lieu of the upcoming modernization steps. Furthermore extensions of the system due to modifications and new processes in the plant will be shown. This paper is a continuation of the paper presented at the ANS Meeting in 2006.
机译:瑞士核电生产包括四个地点,共有5个反应堆。它们的总装机容量为3220 MW,覆盖了瑞士电力总产量的40%。莱布斯塔特(Leibstadt)是第一家瑞士NPP,它至少在2045年之前针对预定的操作执行所有与过程相关的I&C设备的全面现代化项目。该项目将花费15年以上的时间,因为只有在计划内的停机期间才能逐步实施。第一步现代化工作主要是由一个通用平台替换包括安全参数显示系统SPDS在内的以前的独立过程计算机,在2006年停运期间已完成功能,比原目标线延迟了2年。但是,它仍然没有将平台升级到目标系统版本,这被系统供应商大大延迟了。该升级最终在2008年停运期间完成。该平台现在符合具有所有相关应用程序和功能的全面集成的工厂信息系统,但在此之上,它已经构成了未来用于操作的集成过程控制系统的操作和监视级别。随着即将进行的每一个进一步的现代化步骤,部分过程级别将被添加到数字系统响应中。通过替换现有的用于信号询问,组件控制和自动化功能(例如定序器或切换功能)的模拟设备的平台。本文论述了2006年至2008年之间的操作经验以及由于系统行为中的问题和缺陷而必须采取的措施。自2008年停运以来,升级系统的操作经验也将与以前的经验进行比较。本文的中心内容将是平台升级,平台执行以及平台升级的策略,以替代即将到来的现代化步骤。此外,还将显示由于工厂中的修改和新流程而导致的系统扩展。本文是2006年ANS会议上发表的论文的延续。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号