首页> 外文会议>AITES-ITA 2001 World Tunnel Congress Vol.3, Jun 10-13, 2001, Milan, Italy >GOTTHARD BASE TUNNEL - CONSTRUCTION LOT SEDRUN. A CHALLENGE FOR TUNNEL CONSTRUCTION
【24h】

GOTTHARD BASE TUNNEL - CONSTRUCTION LOT SEDRUN. A CHALLENGE FOR TUNNEL CONSTRUCTION

机译:哥达基础隧道-SEDRUN施工地段。隧道建设的挑战

获取原文
获取原文并翻译 | 示例

摘要

The 57 km long Gotthard Base Tunnel in Switzerland is divided into 5 construction lots. The 6.5 km long Sedrun lot is expected to be the most difficult lot due to expected poor ground conditions (squeezing rock) and to the difficult access. At Sedrun the main tunnel drives will start in two directions (north and south) at the bottom of a 800 m deep vertical access shaft. Special construction methods will be used for excavation in zones with squeezing rock.
机译:瑞士长达57公里的Gotthard Base隧道分为5个建筑工地。预计6.5公里长的塞德伦(Sedrun)地段将是最困难的地段,原因是预期的地面条件不佳(挤压岩石)且难以进入。在塞德伦(Sedrun),主要隧道驱动器将在800 m深的垂直通道竖井的底部沿两个方向(北和南)启动。在挤压岩石的区域中,将采用特殊的施工方法进行开挖。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号