DESIGN, CONSTRUCTION AND OBSERVATION OF THE BEHAVIOUR OF MRAZOVKA TUNNEL IN PRAGUE, THE CAPITAL OF THE CZECH REPUBLIC

机译:捷克共和国首都布拉格的MRAZOVKA隧道的设计,施工和观测

获取原文
获取原文并翻译 | 示例

摘要

The construction of the Mrazovka automobile road tunnel, a part of the city ring in Prague, is currently one of the most significant transport constructions in the country. Made up of two three-lane tubes, the tunnel divides into a two-lane tunnel and a one-lane ramp. The three-lane tunnel cross-section area is 165.0 m~2, while the profile area of the fork division point is 163.3 ― 324.2 m~2. Construction of the tunnel commenced on December 21, 1998. The tunnel will be opened in December, 2002. The driven tunnel is. constructed using the New Austrian Tunnelling Method (NATM) in very complicated geo-technical conditions in a densely built-up area with a minimal overburden. This article describes the spatial and construction design of the tunnels, the proposed tunnelling method, the methods of securing the above-ground structures, the experiences from excavation, and the results of measurements and monitoring during the construction of driven underground structures.
机译:Mrazovka汽车公路隧道的建设是布拉格城市圈的一部分,目前是该国最重要的交通建设之一。该隧道由两个三车道的管道组成,分为两个车道的隧道和一个单车道的坡道。三车道隧道断面面积为165.0 m〜2,而叉形分叉点的轮廓面积为163.3〜324.2 m〜2。隧道的建设于1998年12月21日开始。隧道将于2002年12月开放。使用新奥地利隧道法(NATM)在非常复杂的岩土工程条件下,以密集的密集区域和最小的覆盖层来建造。本文介绍了隧道的空间和施工设计,拟议的隧道方法,固定地上结构的方法,开挖的经验以及在驱动地下结构施工期间的测量和监测结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号