首页> 外文会议>9th AusIMM underground operator's conference 2005 >Off to a Good Start with Lift #2:Drawbell Extraction -Northparkes
【24h】

Off to a Good Start with Lift #2:Drawbell Extraction -Northparkes

机译:练习2:举起杠铃-Northparkes

获取原文
获取原文并翻译 | 示例

摘要

The extraction of drawbells in Lift #2 at Northparkes Mines E26 orebodyrnwas achieve by single shot blasting,enabled through the use ofrnelectronic detonators.This paper discusses the designs considered at therntime of the feasibility study and the various changes made to theserndesigns prior to and during the construction phase of the Lift #2 blockrncave.Operational issues encountered are highlighted,as are ways inrnwhich these were overcome.The amount of personnel utilised to mine therndrawbells is also covered.Lists of design and operational considerationsrnto be used for drawbell extractions have been included.
机译:Northparkes Mines E26矿体#2号电梯的吊铃通过单发爆破来实现,这是通过使用电子雷管实现的。本文讨论了可行性研究时考虑的设计以及在设计之前和期间对serndesigns进行的各种更改。 #2号滑车洞的施工阶段。突出了所遇到的操作问题,以及克服这些问题的方法。还涵盖了开采吊铃的人员数量。其中还包括用于吊铃抽出的设计和操作注意事项清单。

著录项

  • 来源
  • 会议地点 Perth(AU)
  • 作者

    A C Silveira; M Lovitt; T Hewitt;

  • 作者单位

    Northparkes Mines,Rio Tinto,rnPO Box 995,Parkes NSW 2870;

    rnOrica Mining Services,rn12 Throssell Street,Kalgoorlie WA 6430;

    rnEastern Australia,Orica Mining Services,rnPO Box 4477,Dubbo East NSW 2830;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号